New Arrivals/Restock

4PCS E12 Candelabra Base with 5.9 Inch Long Lead CUL Certified E12 Lamp Holder Candelabra Bulb Ring for Night Lights Chandeliers Ceiling Lights Table Lamps Black

flash sale iconLimited Time Sale
Until the end
21
51
15

US$4.79 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
Used  US$3.20
quantity

Product details

Management number 250268596 Release Date 2026/09/17 List Price US$3.20 Model Number 250268596
Category

Material: plastic and metal Color: black Size: Wire length: 140mm/5.51 inches Circle: 27x20mm/1.06x0.79 inches 31x24x14mm/1.22x1x0.55 inches Package includes: 4pcs E12 candlestick base lamp holders; Check our product pictures and part numbers carefully before purchase to make sure they are compatible with your table lamp.

  • Durable material: Made of durable plastic and metal, delicate craftsmanship, not easy to damage, can be reused for a long time.
  • These lampholders are UL Listed and rated for 75W max, 125V max. current:2A. with 5.9 inches/15CM long lead.
  • Extension Cord:More connecting circuits, easy to use. Featuring screw-in installation, it is a great replacement for any candlestick socket.
  • Package Includes:You will receive 4pcs E12 Candelabra Base Sockets; easy to install and durable for a variety of lighting applications.
  • Application: Widely used in night lights/sconces/chandeliers/ceiling lights/table lamps. Can be a good replacement for any sconce socket.
ASIN B0F1D6DY3B
Color Black
Base Type Candelabra
Brand Name ZZLZX
Unit Count 4 Count
Part Number 61236-CH-4
Manufacturer ZZLZX
Material Type Metal, Plastic
Mounting Type Threaded
Number of Items 4

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review